List the parts your product is built from with how many of each go into one. Get the cost to build one piece, with consumables, spoilage and the labour of joining shown separately.
| Part | In one | ₹ each | ₹ | |
|---|---|---|---|---|
| 273.00 | ||||
| 96.00 | ||||
| 88.50 | ||||
| 49.50 |
A part measured by the metre or the kilo takes a fraction in the “in one” box. Example rates are illustrative. Type your own.
Cost to build one
₹541.72 /pc
Parts only
₹507.00 /pc
A run of
₹27,086 × 50
The working
parts = Σ (qty × ₹) = ₹507.00 spoilage = + 0.0% = ₹507.00 consumables = ₹4.72 labour = 6.0 min ÷ 60 × ₹300 = ₹30.00 per piece = ₹507.00 + ₹4.72 + ₹30.00 = ₹541.72
The guide behind it
How to calculate the cost of an assembled product (BOM costing) →
Every size, every product, automatically
In Aakar One this number comes from the drawing or recipe, and flows on into the quote, job card, stock and GST.
Will it fit my factory? →Six small boxes. Your details land straight in the founder’s inbox.
+91 98151 81222 · fastest reply
Call
Naman Bhandari · +91 98151 81222
namaste@aakarone.in
Come watch a factory run on it. Ours.
The living showroom: real compounds, real job cards, real GST months. Mention a visit in the form or on WhatsApp. We’ll fix a week.