AAKAR ONE · FOR SHEET METAL FABRICATION
Draw your product once. Quotes, job cards, wastage verdicts, stock, profit and GST are computed from that one drawing, on your own computer.
We know this trade from the inside:
Blank, bend, weld, powder coat. Sheet is bought by the kilo while the enclosure sells by the piece, and the nesting decides how much of that kilo becomes scrap. The scrap is weighed back to its own material at its own rate instead of being averaged into the part.
Wastage is an argument, not a number
Every job card gets a verdict: over, saved, within. The standard is measured on your own scale. The shop-floor argument ends.
→ Wastage verdicts + Factory Story
A new size means “I’ll call you back”
The Estimator answers during the phone call. Any size, on its true curve, floor price included.
→ Estimator + price breaks
The kit is priced at last year’s parts
Every part keeps its own cost, and the kit adds them up on the day you ask. One bought part gets dearer and every kit that uses it says so at once, with the old figure still on the record.
→ Assembly cost + parts list
Six small boxes. Your details land straight in the founder’s inbox.
+91 98151 81222 · fastest reply
Call
Naman Bhandari · +91 98151 81222
namaste@aakarone.in
Come watch a factory run on it. Ours.
The living showroom: real compounds, real job cards, real GST months. Mention a visit in the form or on WhatsApp. We’ll fix a week.