AAKAR ONE · GUIDES

How to calculate manufacturing wastage (and set a fair standard)

Short answer

Wastage % = (material issued − material in good output) ÷ material issued × 100. Judge each job against a standard taken from your own clean past jobs: above it is over, below it is saved, near it is within.

The formula

wastage % = (issued kg − good output kg) ÷ issued kg × 100

Example: 500 kg issued, 462 kg in good product. Wastage = 38 kg, or 7.6%.

Not all waste is the same

  • Seconds: sellable at a lower price - still stock, still value
  • Scrap: sold by weight, a small recovery
  • Byproduct or reclaim: goes back into another product at its own rate
  • True loss: gone, and the only number that should be argued about

Where the standard should come from

Not from a book and not from memory. Take the jobs that ran cleanly on your own floor and measure them. That becomes the standard, and every new job gets a verdict against it. The argument on the floor ends because the number is your own.

Questions people also ask

What is a normal wastage percentage?

It depends entirely on the process - a few percent for simple moulding, much more for cutting from sheet or trimming heavy flash. Your own clean jobs are the only honest benchmark.

Stop calculating this by hand

Aakar One does this arithmetic for every product and every size, then carries the result into the quote, the job card, stock and GST. Manufacturing ERP with CAD built in, made in India.

More guides

Easy connect: 30 seconds

Six small boxes. Your details land straight in the founder’s inbox.

Or reach us directly

WhatsApp

+91 98151 81222 · fastest reply

Call

Naman Bhandari · +91 98151 81222

Email

namaste@aakarone.in

Come watch a factory run on it. Ours.

The living showroom: real compounds, real job cards, real GST months. Mention a visit in the form or on WhatsApp. We’ll fix a week.